Ambers Progress and Builders Progress.
Amber is doing really well, and as you can see, there is no sign of infection, and gradually the cut is healing over. Great news.
We've had a very busy time with the builders here most of last week, and lots of progress being made. Richard has installed the chain down pipes, and they look stunning.
Richard also complete the window flashing.
Jarred has put the capping board in place over the electrical cabling which circuts each room, and hung all the internal doors.
Harvey has made the shelving for the wardrobes and the outside cupboards.
WWOOFer Johan has been busy oiling all the new pieces of timber the builders have installed.
Just after Richard had installed the chain downpipe, we had a heavy shower of rain, so we were all keen to see how the chains performed. Rather a lot of water was missing the chain altogether, and making a very messy landing all over our beautiful snake. After much discussion Richard and Ali have come up with a cunning plan to get the water flowing as it should. Watch this space to see if they are as smart as they think they are!